B.  Preparatory Actions

6.  During contract negotiations with a consulting firm, the PPP Center, through the PDMFS, gives the TA copies of the Performance Evaluation Report (PER) Forms and the Narrative Descriptions of the Criteria (Appendix 1-4) for reference. PPP Center explains the evaluation procedures to the TA.

7.  As may be required, the PDMFS determines the midterm of the TA's assignment.