B.  Preparatory Actions

20.  During the contract negotiations with a consulting firm, the PPP Center, through the PDMFS, gives the TA a copy of the PER Form 2 and the Narrative Description of the Criteria for reference. PPP Center explains the evaluation procedures to the TA.