ARTICLE III CONDITIONS AFTER EFFECTIVE DATE
>
5 CONSTRUCTION, TESTING AND COMMISSIONING
>
5.5 Design, Drawings and Other Documents
5.5
Design, Drawings and Other Documents
More Information
5.5.1 Submission
5.5.2 Review and Comment
5.5.3 Changes after Acceptance
5.5.4 Involvement of Independent Verifier
5.5.5 Disclaimer