The Company shall provide the Agency and the Independent Verifier with four (4) printed copies and one (1) electronic copy each of the detailed engineering designs and plans in respect of the Works not later than [[●] Days prior to the Required Continuous Construction Date/each date required in the Design Timetable]. These main drawings and technical plans shall include the following:
(a) final drawings for the general layout of the Works including permanent access roads;
(b) general and detailed drawings of the New Facilities and the Existing Facilities to be rehabilitated, including all ancillary facilities, structures and civil works;
(c) final arrangements of plans for the general layout of machineries and equipment;
(d) an explanation, in such detail as is necessary and expedient for the Agency to fully understand the detailed engineering designs and plans, and how it complies with the Design and Technical Specifications, Prudent Industry Practice and Consents; and
(e) test procedures that meet the requirements for testing and commissioning provided in Schedule 13 (Testing and Commissioning).