The Company is required to design and construct the entire infrastructure and supply all of the equipment required to operate the New Facilities and for it to integrate with the Existing Facilities. The integration shall provide and enable safe, reliable, consistent, seamless operations between the New Facilities and the Existing Facilities. [Other Specifications]
Systems Operations Specification [Specifications]
System Operating Schedule and Capacity [Specifications]
Environmental Requirements [Specifications]
Electromagnetic Compatibility [Specifications]
Stray Current [Specifications]
Train Control System (Signaling) Specification [Specifications]
General [Specifications]
Train Detection [Specifications]
Headway [Specifications]
Central Control Requirements [Specifications]
Training [Specifications]
Technical Support [Specifications]
Spares and Repairs to Equipment [Specifications]
Operations Control Centre (OCC) Specification [Specifications]
Communications Specification [Specifications]
Fiber Optic Network [Specifications]
Master Clock [Specifications]
Telephones [Specifications]
Operations and Maintenance Radio [Specifications]
Public Address (PA) System [Specifications]
Closed Circuit Television [Specifications]
SCADA (non traction) [Specifications]
Traction Power System Specification [Specifications]
General [Specifications]
Incoming Supply [Specifications]
Traction Sub-stations [Specifications]
Protection [Specifications]
Uninterruptible Power Supplies [Specifications]
Overhead Contact System (OCS) [Specifications]
OCS Design Requirements [Specifications]
Earthing Systems [Specifications]
Corrosion Prevention/Stray Current Control [Specifications]
SCADA [Specifications]