If clients do not wish to prescribe in their tender documentation the minimum level of services which they require to be provided by design team members when employed by a contractor, public sector clients should at least require that submitted tenders include a full description of the proposed scope of design team services, including any proposed role in the inspection of the works on site. This, in addition to the quality of the proposed design team or proposed design, should be important factors in the assessment of such tenders.