There would be significant benefit if the design of wall ties, particularly the type used on the Oxgangs School, more readily enabled both those laying the bricks and those inspecting cavity walls before closure, to determine that the minimum or recommended embedment of wall ties was being or had been achieved. Clearer calibration or marking of these points through the introduction of colour, texture or shape could assist in this process, by making the level of embedment more clearly visible.