Document the risk analysis by:
◼ stating what the project risk is assessed as (Gateway Project Profile Assessment risk evaluation tool)
◼ identifying the range of significant risks
◼ measuring each of the risk exposures in the project/program, in terms their likelihood (e.g. almost certain, unlikely) and their consequences (e.g. very high, moderate)
|
| Risk exposure = Consequences x Likelihood |
| ||||||
|
| Likelihood | |||||||
| Consequences | Rare -1 | Unlikely -2 | Moderate -3 | Likely -4 | Almost certain - 5 | |||
| Very high - 5 | 5 | 10 | 15 | 20 | 25 | |||
| Major - 4 | 4 | 8 | 12 | 16 | 20 | |||
| Moderate - 3 | 3 | 6 | 9 | 12 | 15 | |||
| Minor - 2 | 2 | 4 | 6 | 8 | 10 | |||
| Insignificant -1 | 1 | 2 | 3 | 4 | 5 | |||
| Key Risk Exposure: |
| |||||||
|
| Very high | High | Moderate | Low | ||||
◼ assessing whether the level of each risk is acceptable, and what the controls are to mitigate or reduce the level of gross risk
Document risk management approach by:
◼ selecting the option most appropriate to mitigate or reduce each identified risk
◼ identifying and assigning the resources necessary to do the work
◼ stating what will be done to monitor the status of each risk, and checking controls are performed and are effective