Additional container terminal provision, in the form of reclamation for 30.8 ha of container terminal facilities and 5.8 ha of Roll On - Roll Off (Ro-Ro) terminal. Facilities prepared in this phase are 4 container docks with length 3x250 m and 1 Ro-Ro dock with length 300 m, container stacking yard, field for Ro-Ro, and related building facilities.