2.2.  Project Description

Sukabumi - Ciranjang Toll Road is planned to be divided into two section: First, Sukabumi - West Cianjur along 15,15 km (Sta. 52+800 - Sta. 67+950) which directly connected with Sukabumi - Cianjur - Bandung road. Second, Cianjur Barat - Ciranjang section (Sta. 67+950 to Sta 80+800) which connected with artery road Cianjur and Bandung.