The technical specifications for Sukabumi - Ciranjang Toll Road are as follows:

Length (Sta 53+500 to Sta 81+300)

27.8 km

Design Speed

80 - 100 km/hour

Total ways and lanes

 

-  Initial Phase

2 @ 2 X 3.6 M

-  Final Phase

2 @ 2 X 3.6 M

Road Side

 

-  Initial Phase

 

Outer Roadside

2 @ 3.00 m

Inner Roadside

2 @ 1.50 m

-  Final Phase

 

Outer Roadside

2 @ 3.00 m

Inner Roadside

2 @ 1.50 m

Median

 

-  Initial Phase

9.70 m to 12.7 m

-  Final Phase

2.50 m to 4.3 m

Design Life

20 years