The technical specifications for Sukabumi - Ciranjang Toll Road are as follows:
Length (Sta 53+500 to Sta 81+300) | 27.8 km |
Design Speed | 80 - 100 km/hour |
Total ways and lanes |
|
- Initial Phase | 2 @ 2 X 3.6 M |
- Final Phase | 2 @ 2 X 3.6 M |
Road Side |
|
- Initial Phase |
|
Outer Roadside | 2 @ 3.00 m |
Inner Roadside | 2 @ 1.50 m |
- Final Phase |
|
Outer Roadside | 2 @ 3.00 m |
Inner Roadside | 2 @ 1.50 m |
Median |
|
- Initial Phase | 9.70 m to 12.7 m |
- Final Phase | 2.50 m to 4.3 m |
Design Life | 20 years |