2.2. Project Description

The route of 2nd Jakarta - Cikampek Toll Road is proposed at south of existing Jakarta - Cikampek Toll Road to avoid paddy field that spread widely in the north side. The initial section of the toll road alignment is starting from JORR section, going parallel to the existing toll road and connecting to Cipularang Toll Road with total length approximately 62 km. The end point is proposed at the crossing point to Cipularang Toll Road, in the south of Indotaisei Industrial Estate.

One of the attractive point for development of this toll road is it will have tremendous facilities, such as development of residential area and commercial areas along the corridor. In order to facilitate and manage high traffic growth and smoothen people's movement in this corridor, a scheme of Transit Oriented Development that integrates low cost residential area, commercial area and access to public transport will be proposed to be developing in this area.

There will be BRT system, which proposed by DKI Jakarta Government, on this corridor to maximize access to public transport. It is expected to connect the existing bus routes such as Trans Jakarta in DKI Jakarta.