4. Project Technical Specification
The technical specifications for The 2nd Jakarta - Cikampe Toll Road are as follows:
• The forecast toll tariff of toll road section is Rp. 900/km. It was calculated by financial evaluation.
• Design Speed for Main Road
The design speed is 100km/h because the target road travels through the intercity and rolling and flat areas.
| Estimated project cost | Design Speed (km/hg) | |
| Intercity | Inner-city | |
| Flat | 120 | 80 - 100 |
| Rolling | 100 | 80 |
| Hilly | 80 | 60 |
• Design Speed for Junction
The design speed of JCT ramps applies the possible lowest speed in order to minimize the influenced are as shown in table. Therefore, design speed is 40 km/h at JCT between the 2nd Jakarta - Cikampek Toll Road and JORR and JORR2 also.
| Toll I | Design Speed (km/hg) | |||
| 120 | 100 | 80 | 60 | |
| 120 | 60 - 80 | |||
| 100 | 60 - 80 | 60 - 80 | ||
| 80 | 40 - 60 | 40 - 60 | 40 - 60 | |
| 60 | 40 - 60 | 40 - 60 | 40 - 60 | 40 - 60 |