The technical specifications for Yogyakarta - Bawen Toll Road are as follows:
Length | 71.561 km |
Design Speed | 80 - 120 km/hour |
Total ways and lanes |
|
- Initial Phase | 2 @ 2 X 3.6 M |
- Final Phase | 2 @ 2 X 3.6 M |
Road Side |
|
- Initial Phase | 3.00 |
- Initial Phase | 1.50 m |
Median (inc. inner roadside | 5.5 m |