4.  Project Technical Specification

The technical specifications for Yogyakarta - Bawen Toll Road are as follows:

Length

71.561 km

Design Speed

80 - 120 km/hour

Total ways and lanes

 

-  Initial Phase

2 @ 2 X 3.6 M

-  Final Phase

2 @ 2 X 3.6 M

Road Side

 

-  Initial Phase

3.00

-  Initial Phase

1.50 m

Median (inc. inner roadside

5.5 m