The land and access provisions for the Operational Phase, including the basis on which tenure will be granted, must be considered on a project specific basis.
If the land is Reserved Crown Land there are limits on the duration of the licence. The maximum licence term is 10 years or 21 years in limited circumstances. If a longer period is required then project specific legislation will be needed.