2.4.1  Scope of Works

Guidance note: This Section is intended to provide a description of the key elements of the Project asset(s) to be delivered by Project Co during the Development Phase with reference to the design, construction, commissioning and testing.  

A high level summary of the Works is provided below.  Full details are provided in the PSDR set out in Volume 2 (Project Scope and Delivery Requirements).

Project Co will be responsible for the design, construction and commissioning of the following [insert assets and systems to be delivered by Project Co]:

•  [Insert high level dot point summary of the asset(s) to be designed, constructed and commissioned by Project Co]