5 In April 2013, Crossrail Ltd awarded the contract to install track, overhead lines to power the trains and other systems including drainage and ventilation in all the Crossrail tunnels on the central section, to a joint venture between Alstom, Costain and TSO. At the time the contract was awarded, Crossrail Ltd expected it to cost £323 million.