Figure 9 summarizes the results of the evaluation process carried out since the publishing of the previous edition of the PPP Book. Of the 22 projects contained in the 2017 edition, some projects have been removed, some are carried in this edition. The carried projects are:
1. Jakarta-Cikampek South Toll Road
2. Bandar Lampung Water Supply, Bandar Lampung
3. Medan Municipal Transport, North Sumatera
4. Pekanbaru Water Supply, Pekanbaru
5. Sam Ratulangi Teaching Hospital, Manado, South Sulawesi
6. Yogya-Bawen Toll Road
7. Multifunction Satellite
8. Nusakambangan Industrial Correctional Facility, Central Java
The PPP Book 2018 contains those projects that have evolved or remained unchanged from the previous edition and new projects that have succeeded in the evaluation of the process.

Figure 9. PPP Book 2017 Evaluation