The Partnership options are as follows:
- BOT (Build - Operate - Transfer). IPA development along with a 1000 l/sec as well as a distribution reservoir, and a water transmission pipe to each of the distribution reservoirs to serve the service area development plan.
- Operation and maintenance of intake, grit chamber, and pump house along with its complementary buildings and raw water network constructed by the Ministry of Public Works and People's Housing through the Directorate General of Water Resources