The Business Entity shall be responsible for the design, financing, construction, and operation of the upstream part. As well as the investment portion of piping, namely:
1. Intake that will take raw water from Siak River with capacity 550 l/sec
2. IPA with a Total Capacity of 550 l/p
3. Raw water transmission Pipes
4. Main pipeline distribution investments