The project was an expansion of an existing airport. The design overlapped with the existing operational assets, making it difficult to build while the airport was operational, and the old structure was limited in space. Construction works therefore needed to be adapted to mitigate safety and security risks. In most cases, the expansion was performed in stages, where a section would be completed and opened for use before moving to another one.