The contents of a sample ToR for the selection of a technical consultant for preparation of a feasibility report for the development of road stretches is set out below. The public entity may choose to improvise on the contents indicated below.
| Indicative Content - ToR for Selection of Consultant for Preparation of Feasibility Report for Roads Contents 1. General 2. Objective 3. Scope of Services 3.1. Scope of Services 3.2. Traffic surveys and demand assessment 3.3. Engineering surveys and investigations 3.4. Proposal for Sections passing through urban areas 3.5. ROBs/RUBs 3.6. Protective works in hill sections, retaining walls, breast walls, etc 3.7. Road signs, safety devices 3.8. Toll Plazas 3.9. Truck lay byes 3.10. Bus bays and bus shelters 3.11. Social impact assessment 3.12. Environment impact assessment 3.13. Preliminary designs 3.14. Project cost 3.15. Financial analysis and bid process 4. Deliverables 4.1. Inception Report 4.2. Report on Alignment and First Traffic Survey 4.3. Land Plan Schedules 4.4. Utility Relocation Plans 4.5. Reports on Environment and Social Impact Assessment 4.6. Report on Indicative GAD of Structure 4.7. Feasibility Report 4.8. Schedules of Concession Agreement 4.9. Financial analysis 4.10. Assistance during bid process 5. Specific requirements for the Project Highway 6. Time and Payment Schedule 7. Meetings 8. Consultancy Team 9. Reporting 10. Data and software to be made available by the Authority 11. Completion of Services 12. ATTACHMENTS Attachment A : Topographic Survey Attachment B: Indicative List of Drawings for Schedule-H of the Concession Agreement 13. PROFORMA Proforma 1: Road Inventory Proforma 2: Inventory and Condition Survey for Culverts Proforma 3: Inventory of Structures Proforma 4: Road Condition Survey Proforma 5: Bridge Condition Survey |