DESIGN-BUILD-FINANCE-OPERATE MODEL

2.1.2  Figure 2.1.1 illustrates the typical commercial structure of a DBFO project. The centre of the DBFO project is a PPP contract within which the public sector specifies the outputs it requires from a public service facility, the basis for payment for those outputs, and the risk-sharing arrangements between the public and private sectors, typically over 15-30 years.

Figure 2.1.1 Typical DBFO project structure