This section shall show the ability to carry out the project by comparing the budget with the PPP reference model modified to contain risks. Based on the comparison results, two possible cases shall be found as follows:
First: If the costs of the PPP model or the net present value are less than the budget, there shall be ability to carry out the project.
Second: If it is not so, and there is no ability to carry out the project, there are two options:
• Waiving the project, or
• Modifying the output specifications to place the project within the limits of the ability to carry it.