To provide:
• An assessment of building condition, including M&E services using RICS condition grades and priority ratings against the required standard to meet the Handback requirements set out in the Project Agreement.
• A written report providing a summary of the general condition of the surveyed areas, the key findings of the documentation review and survey outputs. Financial analysis demonstrating the costs that are expected to be incurred by ProjectCo up to end of contract and those that are expected to exist in the period of the following five years after the end of contract for the public body to understand the potential financial exposure.
This will include:
Building condition/schedule of activity:
• Undertake a visual inspection with an element of disruptive survey where necessary of the building fabric, mechanical and electrical services including public utility services entering the premises. The extent of inspection required is detailed below for each Facility.
• Report on all relevant statutory compliance matters.
• Liaise with the existing building managers and FM contractors where relevant to understand recent (within the last 5 years) and proposed future planned maintenance works.
• For each of the principal building elements an assessment of the existing condition using RICS condition grades and priority ratings.