Where public works are complex, there is a risk of low-cost bias, even if evaluation criteria are designed to balance quality and cost.
Departments should refer any abnormally low bid that is more than 10% lower than the average of all bids or the Should Cost Model to the Cabinet Office prior to accepting it. This is to be done in accordance with the relevant regulations.
