Bibliography

ABC News (2011). "O'Farrell hails new political landscape". ABC News. https://www.abc.net.au/news/2011-03-27/ofarrell-hails-new-political-landscape/2642320.

(2015). "Gold Coast light rail gets $95m federal funding boost in time for 2018 Commonwealth Games". ABC News.

https://www.abc.net.au/news/2015-10-11/gold-coast-light-rail-gets-95m-federal-funding-boost/6844704.

ABS (2020a). Labour Force, Australia, Detailed, Aug 2020. Cat. 6291.0. Australian Bureau of Statistics.

https://www.abs.gov.au/statistics/labour/employment-and-unemployment/labour-force-australia-detailed.

(2020b). Migration, Australia, 2018-19. Cat. 3412.0. Australian Bureau of Statistics.

https://www.abs.gov.au/statistics/people/population/migration- australia/latest-release.

(2020c). Producer Price Indexes, Australia, Mar 2020. Cat. 6427.0. Australian Bureau of Statistics.

https://www.abs.gov.au/statistics/economy/price-indexes-and-inflation/producer-price-indexes-australia/mar-2020.

Adept Economics (n.d.). Demystifying Brisbane's Cross-River Rail: a PPP, an alliance, and a traditional procurement.

https://adepteconomics.com.au/demystifying-brisbanes-cross-river-rail-a-ppp-an-alliance-and-a-traditional-procurement/.

AECOM (2020). Sydney Metro Northwest.

https://aecom.com/au/projects/sydney-metro-northwest/.

Albanese, A. (2020). Australia beyond the coronavirus. Fifth vision statement speech. https://anthonyalbanese.com.au/anthony-albanese-speech-australia-beyond-the-coronavirus-canberra-monday-11-may-2020.

Andrews, D. (2017). North East Link - Victoria's Biggest Ever Transport Project. https://www.premier.vic.gov.au/north-east-link-victorias-biggest-ever-transport-project/.

(2018). Underground Suburban Rail Loop To Connect Victoria. https://www.premier.vic.gov.au/underground-suburban-rail-loop-connect-victoria.

ARTC (2010). Melbourne-Brisbane Inland Rail Alignment Study. Australian Rail Track Corporation.

http://www.artc.com.au/library/IRAS_Final%20Report.pdf.

(2015). Inland Rail 2015: ARTC 2015 Inland Rail Programme Business Case. Australian Rail Track Corporation. https://s3-ap-southeast-2.amazonaws.com/ehq-production-australia/5de589db79424a8f1344e2e42e171fc205104b99/documents/attachments/000/029/855/original/lnlandRailBusinessCase.pdf?1448785278.

Audit Office of New South Wales (2016). CBD and South East Light Rail Project. https://www.audit.nsw.gov.au/our-work/reports/cbd-and-south-east-light-rail-project.

(2020). CBD and South East Light Rail: follow-up performance audit. https://www.audit.nsw.gov.au/our-work/reports/cbd-and-south-east- light-rail-follow-up-performance-audit.

Australian Associated Press (2016). "Labor demands audit of govt projects". news.com.au. https://www.news.com.au/national/breaking-news/labor-demands-audit-of-govt-projects/news-story/817232912465ba7900ea099dbbc36674.

Battley, T. (2020). "Infrastructure: an increasingly risky business". AECOM. https://infrastructure.aecom.com/2020/funding-infrastructure-an-increasingly-risky-business.

Baxendale, R. (2020). "Melbourne Metro rail tunnel cost blowouts under scrutiny". The Australian. https://www.theaustralian.com.au/nation/politics/melbourne-metro-rail-tunnel-cost-blowouts-under-scrutiny/news-Story/cc570ec9f4feeea1b74b3f93b36b6317.

Beck et al (2020). Beck, M. J., Hensher, D. A. and Wei, E. "Slowly coming out of COVID-19 restrictions in Australia: Implications for working from home and commuting trips by car and public transport". Journal of Transport Geography 88 (102846). https://www.sciencedirect.com/science/article/pii/S0966692320307122.

Beech, J. (2015). "Metro to reshape stations on route". English. Canterbury-Bankstown Express, p. 8.

https://www.dailytelegraph.com.au/newslocal/northern- beaches/bankstown-and-punchbowl-train-stations-on-track-for-upgrade-as-part-of-sydney-metro-project/news-Story/6b3ee22c34d05e6f73c7765701c9f169.

BITRE (2018). Road construction cost and infrastructure procurement benchmarking:2017 update. Bureau of Infrastructure, Transport and Regional Economics.

https://www.bitre.gov.au/sites/default/files/rr148.pdf.

Black, J. (2014). "Traffic risk in the Australian toll road sector". Public Infrastructure Bulletin, pp. 18-29. https://www.semanticscholar.org/paper/Traffic-risk-in-the-Australian-toll-road-sector-Black/80142c0791 dd6ff67f7cc2f3c1ec7580d8c34894.

Bligh, A. (2008). Premier gives the green light to Australia's largest road project. Media statement.

https://web.archive.org/web/20091026223010/http://www.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=58107.

Brady, S. (2019). Review of all fatal accidents in Queensland mines and quarries from 2000 to 2019. Prepared for the Department of Natural Resources, Mines and Energy. Brady Heywood Pty Ltd. https://www.parliament.qld.gov.au/documents/tableOffice/TabledPapers/2020/5620T197.pdf.

Brennan, M. (2020). The COVID-19 recovery: a view from the supply side. Speech to the Australian Business Economists.

https://www.pc.gov.au/news-media/speeches/covid-recovery.

Brisbane City Council (2004). North-South Bypass Tunnel - Stage 1, Phase 2 - Feasibility Study: Initial advice statement.

https://www.statedevelopment.qld.gov.au/resources/project/clem-jones-tunnel/north-south-bypass-tunnel-ias.pdf.

Budd, H. (2013). "M2 widening nears completion and designs for $10 billion WestConnex project set for release". Daily Telegraph.

https://www.dailytelegraph.com.au/news/nsw/m2-widening-nears- completion-and-designs-for-10-billion-westconnex-project-set-for-release/news-story/ae0c993d00184b8d8d34ee61759dbc83.

Building Queensland (2016). Beerburrum to Nambour rail upgrade: Detailed Business Case 2016: Cost benefit analysis summary.

https://buildingqueensland.qld.gov.au/wp-content/uploads/2018/07/B2N-Cost-Benefit-Analysis-Summary.pdf.

(2017a). Bruce Highway - Cairns Southern Access Corridor Stage 3 - Edmonton to Gordonvale: Detailed Business Case 2017: Cost benefit analysis summary, https://buildingqueensland.qld.gov.au/wp-content/uploads/2018/11/E2G-cost-benefit-analysis-summary.pdf.

(2017b). Bruce Highway - Cairns Southern Access Corridor Stage 4 - Kate Street to Aumuller Street: Detailed Business Case 2017: Cost benefit analysis summary, https://buildingqueensland.qld.gov.au/wp-content/uploads/2018/11/K2A-cost-benefit-analysis-summary.pdf.

(2017c). Townsville Eastern Access Rail Corridor: Detailed Business Case. https://buildingqueensland.qld.gov.au/wp-content/uploads/2018/04/TEARC-Detailed-Business-Case-1.pdf.

(2017d). Smithfield transport corridor upgrade project: Cost benefit analysis summary, https://buildingqueensland.qld.gov.au/wp-content/uploads/2018/02/Smithfield-Transport-Corridor-Upgrade_CBA.pdf.

Building Queensland (2018a). M1 Pacific Motorway - Eight Mile Plains to Daisy Hill (EMP2DH): Detailed Business Case 2018: Business case / Cost benefit analysis summary, https://buildingqueensland.qld.gov.au/wp-content/uploads/2019/02/M1-Eight-Mile-Plains-to-Daisy-Hill-summary.pdf.

(2018b). M1 Pacific Motorway - Varsity Lakes to Tugun (VL2T): Detailed Business Case 2018: Business case / Cost benefit analysis summary, https://buildingqueensland.qld.gov.au/wp-content/uploads/2019/02/MI-Varsity-Lakes-to-Tugun-summary.pdf.

(2018c). Bruce Highway - Deception Bay Road interchange upgrade project: Detailed Business Case 2018: Business case / cost benefit analysis summary, https://buildingqueensland.qld.gov.au/wp-content/uploads/2018/05/Bruce-Highway-Deception-Bay-Road-lnterchange.pdf.

(2018d). Bruce Highway - Maroochydore interchange project: Detailed Business Case 2018: Business case / cost benefit analysis summary, https://buildingqueensland.qld.gov.au/wp- content/uploads/2018/06/Bruce-Highway-Maroochydore-lnterchange.pdf.

(2018e). Bruce Highway - Caboolture-Bribie Island Road interchange to Steve Irwin Way interchange: Detailed Business Case 2018: Business case / cost benefit analysis summary. https://buildingqueensland.qld.gov.au/wp-content/uploads/2018/06/Bruce-Highway-Caboolture-Bribie-lsland-Road-to-SIW.pdf.

(2019). Centenary Bridge upgrade project: Business case / cost benefit analysis summary. https://buildingqueensland.qld.gov.au/wp-content/uploads/2019/11 /Centenary_Bridge_CBA_Summary.pdf.

Caisley, O. (2019). "Frydenberg vows to tackle capacity constraints hampering infrastructure projects". The Australian.

https://www.theaustralian.com.au/nation/josh-frydenberg-rejects- state-push-to-bring-back-asset-recycling/news- story/2147b64f5c81 d6062d87450bec7acb98.

Caldwell, F. (2018). "Trad slams snub of Cross River Rail by Infrastructure

Australia". Brisbane Times. https://www.brisbanetimes.com.au/politics/queensland/trad-slams-snub-of-cross-river-rail-by-infrastructure-australia-20180327-p4z6gb.html.

Capital Metro Agency (2014). Capital Metro Full Business Case. https://www.cityservices.act.gov.au/data/assets/pdf_file/0010/887680/Light-rail-Capital-Metro-Business-Case-ln-Full.pdf.

Carey, A. (2018). "Rail pledge makes claim to take politics out of planning sound hollow". The Age.

https://www.theage.com.au/politics/victoria/rail-pledge-makes-claim- to-take-politics-out-of-planning-sound-hollow-20180829-p500jj.html.

Chesterton, A. (2008). "The new $152m light rail plans for Sydney - Proposals for extending the network through city and further into inner west are on the right track". Sunday Telegraph. 6 April.

Chowdhury et al (2020). Chowdhury, F, Naulls, A. and Smithers, J. Optimising project delivery performance. Austroads.

https://austroads.com.au/publications/project-delivery/ap-r630- 20/media/AP-R630-20_Optimising_Project_Delivery_Performance.pdf.

Collins, A. (2019). "Sydney Metro Northwest showcased as NSW election focus moves back to transport". ABC News.

https://www.abc.net.au/news/2019-03-19/sydney-metro-northwest- showcased-during-nsw-election/10915982.

Commonwealth of Australia (2017). Budget 2017-18: Budget Paper 1. https://archive.budget.gov.au/2017-18/bp1/bp1.pdf.

(2018). Final budget outcome 2017-18. https://archive.budget.gov.au/2017-18/fbo/FBO_2017-18_Combined.pdf.

(2019). Final budget outcome 2018-19.

https://archive.budget.gov.au/2018-19/fbo/FBO_2018-19_web.pdf.

(2020a). Budget 2020-21: Budget Paper 1.

https://budget.gov.au/2020-21/content/bp1/download/bp1_w.pdf.

Commonwealth of Australia (2020b). Budget 2020-21: Budget Paper 2. https://budget.gov.au/2020-21/content/bp2/download/bp2_complete.pdf.

(2020c). Final budget outcome 2019-20. https://budget.gov.au/2019-20/content/fbo/download/FBO-2019-20.pdf.

Coorey, P. (2019). "Infrastructure boom triggers cost blowouts: PM". Australian Financial Review. https://www.afr.com/politics/federal/infrastructure-boom-triggers-cost-blowouts-pm-20190904-p52o18.

Coorey, P. and Cranston, M. (2020). "Spend big but don't make whoopee, PM tells states". Australian Financial Review.

https://www.afr.com/politics/federal/spend-big-but-don-t-make-whoopee-pm-tells-states-20200814-p55lnz.

Council of Australian Governments (2020). Communique of the meeting of 13 March 2020.

https://www.coag.gov.au/sites/default/files/communique/communique-13-march2020.pdf.

Croagh, M. (2020). "A new deal for infrastructure in Australia?" Linkedln. https://www.linkedin.com/pulse/new-deal-infrastructure-australia-matthew-croagh/.

Crockford, T. and Lynch, L. (2020). "Cross River Rail board to be sacked as Minister takes the reins". Brisbane Times.

https://www.brisbanetimes.com.au/national/queensland/cross-river-rail-board-to-be-sacked-as-minister-takes-the-reins-20200226-p544eu.html.

DIRD (2016). The Australian Government's Response to Infrastructure Australia's Australian Infrastructure Plan. Department of Infrastructure and Regional Development. https://www.infrastructure.gov.au/infrastructure/publications/files/Australian-Government-Response-to-Australian-Infrastructure-Plan_Nov- 2016.pdf.

(2017). Guidance note 2: base cost estimation. Department of Infrastructure and Regional Development.

https://investment.infrastructure.gov.au/files/cost_estimation_guidanc e/Guidance_Note_2_Base_Cost_Estimation.pdf.

DIRDC (2018). Guidance note overview. Department of Infrastructure, Regional Development and Cities. https://investment.infrastructure.gov.au/files/cost_estimation_guidance/Overview-Version-1.0.pdf.

DITCRD (2019). Notes on administration for land transport infrastructure projects 2019-2024. Administrative detail to support the National Partnership Agreement on land transport infrastructure projects. Department of Infrastructure, Transport, Cities and Regional Development. https://investment.infrastructure.gov.au/files/notes_on_administration/final- notes-on-administration.pdf.

Edwards, J. (2017). "Melbourne's West Gate Tunnel project cost blows out by $1.2b". ABC News. https://www.abc.net.au/news/2017-12-12/melbournes-west-gate-tunnel-project-cost-blows-out/9248994.

Elks, S. (2020). "QLD Labor's $5.4bn Cross River Rail project receives 150 safety warnings over asbestos, hazardous chemicals and heights". The Australian, https://www.theaustralian.com.au/nation/qld-labors- 54bn-cross-river-rail-projects-receives-150-safety-warnings-over-asbestos-hazardous-chemicals-and-heights/news- Story/3c2a790f8f02ad 1 f906a040392a86f46.

Elks, S. and Williams, P. (2020). "Queensland's $5.4bn warning shot on Brisbane Cross River Rail project". The Australian.

https://www.theaustralian.com.au/nation/queensland-government- seizes-control-of-cross-river-rail-project-amid-contractor- concerns/news-story/b3844fd1eb46b47add1d13ad94259bf4.

Flyvbjerg, B. (2014). "What you should know about megaprojects and why: an overview". Project Management Journal, https://papers.ssrn.com/sol3/papers.cfm?abstract_id=2424835.

Fox, J. and King, G. (2018). "Is the $50 billion Melbourne suburban rail loop the answer for congestion and housing?" The Real Estate Conversation.

https://www.therealestateconversation.com.au/news/2018/08/31/the-50-billion-melbourne-suburban-rail-loop-the-answer-congestion-and-housing.

Freed, J. (2014). "Truss sees infrastructure tenders at half the price". Sydney Morning Herald. https://www.smh.com.au/business/truss-sees-infrastructure-tenders-at-half-the-price-20141015-1169pk.html.

Galloway, A. (2016). "Andrews government commits to building $10 billion North East Link". Herald Sun.

https://www.heraldsun.com.au/news/victoria/andrews-government-commits-to-building-10-billion-north-east-link/news-story/11189d8bbba7f37feca2a8590371059d.

Glaeser, E. (2016). "If you build it...: myths and realities about America's infrastructure spending". City Journal.

https://www.city-journal.org/html/if-you-build-it-14606.html.

Gordon, P. (2020). "Brisbane's $5.4 Billion Cross River Rail". Investo Property. https://www.investoproperty.com.au/brisbanes-5-4-billion-cross-river-rail.

Harris, R. and Galloway, A. (2019). "Prime Minister Scott Morrison to announce $2b fast rail between Melbourne and Geelong". Herald Sun. 21 March.

https://www.heraldsun.com.au/news/victoria/prime-minister-scott-morrison-to-announce-2b-fast-rail-between-melbourne-and-geelong/news-story/c65aafa25d69b30cc766796d67f75de8.

Hart, A. (2016). "Is the window closing for lower cost infrastructure investment?" Linkedln. https://www.linkedin.com/pulse/window-closing-lower-cost-infrastructure-investment-adrian-hart/.

Hayford, O. (2020a). Rebalancing risk allocation on infrastructure projects. DLA Piper. https://www.dlapiper.com/en/australia/insights/publications/2020/08/rebalancing-risk-allocation-on-infrastructure-activity/.

(2020b). Improving public private partnerships - lessons from Australia. DLA Piper.

https://www.dlapiper.com/en/australia/insights/publications/2020/05/improving-public-private-partnerships---lessons-from-australia/.

Hosking, W. (2020). "How suburban rail loop will change your suburb". Herald Sun. https://www.heraldsun.com.au/news/victoria/how-suburban-rail-loop-will-change-your-suburb/news-Story/38cf4068665ea8c6c5c83659fc101c0f.

IMF (2020). Fiscal monitor: policies for the recovery. International Monetary Fund. https://www.imf.org/en/Publications/FM/lssues/2020/09/30/october-2020-fiscal-monitor#Full%20Report%20and%20Executive%20Summary.

Infrastructure Australia (2016). Project Business Case Evaluation - Inland Rail. https://www.infrastructureaustralia.gov.au/sites/default/files/2019-08/final_inland_rail_project_evaluation_summary_0.pdf.

(2017). Project Evaluation Summary: Cross River Rail. Infrastructure Australia.

https://www.infrastructureaustralia.gov.au/sites/default/files/2019-06/20170727-Cross-River-Rail-Summary.pdf.

(2018a). Infrastructure decision-making principles.

https://www.infrastructureaustralia.gov.au/sites/default/files/2019-06/lnfrastructure_Decision-Making_Principles.pdf.

(2018b). Assessment Framework.

https://www.infrastructureaustralia.gov.au/sites/default/files/2019-06/infrastructure_australia_assessment_framework_2018.pdf.

(2019). The Australian Infrastructure Audit 2019. An assessment of Australia's future infrastructure needs.

https://www.infrastructureaustralia.gov.au/publications/australian-infrastructure-audit-2019.

(2020). Infrastructure Priority List.

https://www.infrastructureaustralia.gov.au/sites/default/files/2020-02/2020%20Infrastructure%20Priority%20List%20HI%20resolution.pdf.

Infrastructure NSW (2020). Timely information on infrastructure projects - a guide. https://www.insw.com/expert-advice/timely-information-on-infrastructure-projects/.

Infrastructure NSW, TfNSW, and RMS (2012). WestConnex- Sydney's next motorway priority. Infrastructure NSW, Transport for NSW, and Roads & Maritime Services.

https://www.infrastructure.nsw.gov.au/media/1160/insw_tfnsw_and_roads_and_maritime_services_wcx_25_sept_2012_final_120927.pdf.

Infrastructure Tasmania (2019). 30-Year Infrastructure Strategy.

https://www.stategrowth.tas.gov.au/infrastructure_tasmania/30- year_infrastructure_strategy.

Infrastructure Victoria (2020). Fair Move: Better Public Transport Fares for Melbourne, https://www.infrastructurevictoria.com.au/wp-content/uploads/2020/09/Fair-Move-Better-Public-Transport-Fares-for-Melbourne-FINAL.pdf.

Jacks, T. (2020). "$3 billion overruns on West Gate Tunnel". The Age.

https://www.theage.com.au/national/victoria/3-billion-overruns-on-west-gate-tunnel-20200921-p55xkf.html.

Jacks, T. and Preiss, B. (2018). "State government announces massive suburban rail loop for Melbourne". The Age. https://www.theage.com.au/national/victoria/state-government-announces-massive-suburban-rail-loop-for-melbourne-20180828-p5005r.html.

Jacks, T. and Danckert, S. (2019). "Metro Tunnel machines grind to halt in dispute over billions in cost blowouts". The Age. https://www.theage.com.au/national/victoria/metro-tunnel-machines-grind-to-halt-in-dispute-over-3b-cost-blowouts-20191209-p53i2p.html.

Jacks et al (2019). Jacks, T., Koob, S. F. and Carey, A. "Morrison 'can't deliver' Geelong rail plan for $4b, minister claims". The Age.

https://www.theage.com.au/politics/victoria/morrison-can-t-deliver-geelong-rail-plan-for-4b-minister-claims-20190322-p516i1.html.

Jacks, T. and Lucas, C. (2020). "Transurban asked to rip up West Gate Tunnel contract, court documents allege". The Age. https://www.theage.com.au/national/victoria/transurban-launches-legal-action-against-west-gate-tunnel-s-builders-20200609-p550on.html.

Jacks, T. and Towell, N. (2020). "Deal cut on Metro Tunnel's blowout billions after government 'cave in'". The Age. https://www.theage.com.au/national/victoria/deal-cut-on-metro-tunnel-s-blowout-billions-after-government-cave-in-20201015-p565a5.html.

John Holland (2020). Airport Link M7 & Northern Busway.

https://www.johnholland.com.au/our-projects/airport-link-m7-northern-busway/.

Johnston et al (2019). Johnston, M., Campbell, J. and White, A. "Fears contaminated soil could put brakes on $6.7 billion road project". Herald Sun. https://www.heraldsun.com.au/news/victoria/fears-contaminated-soil-could-put-brakes-on-67-billion-road-project/news-story/24ee9879100825fdbc461ecf42a47c9d.

Jones, A. (2019). "'Full credit to Gladys': Northwest Metro to open ahead of schedule and under budget". 2GB.

https://www.2gb.com/full-credit-to-gladys-northwest-metro-to-open-ahead-of-schedule-and-under-budget/.

Jones, C. I. (2020). "The end of economic growth? Unintended consequences of a declining population". National Bureau for Economic Research. http://conference.nber.org/conf_papers/f135902.pdf.

Jong et al (2019). Jong, G. de, Vignetti, S. and Pancotti, C. "Ex-post evaluation of major infrastructure projects Ex-post evaluation of major infrastructure projects". Transportation Research Procedia. 46th European Transport Conference 2018 42, pp. 75-84. https://www.sciencedirect.com/science/article/pii/S2352146519305757.

Kehoe, J. (2020). "Why the RBA boss wants the stimulus to shift". Australian Financial Review, https://www.afr.com/policy/economy/rba-boss-urges-stimulus-shift-20200813-p55lbi.

Kembrey, M. (2015). "Second crossing 'under way' after power go-ahead: Transport - Poles and wires bill passes". Sydney Morning Herald, p. 2. https://www.smh.com.au/national/nsw/nsw-governments-electricity-privatisation-gets-second-harbour-rail-crossing-under-way-20150604-ghggqj.html.

Knowles, D. (2020). "Mammoth $5.4 billion project drives hiring spree".

Courier Mail. https://www.couriermail.com.au/business/mammoth-54-billion-project-drives-hiring-spree/news-Story/0e4a5e1b1053e681436b3f80b7196c9c.

Legislative Council Public Accountability Committee (2019). Impact of the CBD and South East Light Rail Project. Report 2.

https://www.parliament.nsw.gov.au/lcdocs/inquiries/2492/Final%20Report%20-%20Impact%20of%20the%20CBD%20and%20South%20East%20Light%20Rail%20Project.pdf.

Love et al (2015). Love, P., Smith, J., Simpson, I. and Regan, M. "Understanding the landscape of overruns in transport infrastructure projects". Environmental and Planning B: Planning and Design 42, pp. 490-509. http://epb.sagepub.eom/content/42/3/490.abstract.

Love et al (2016). Love, P., Ahiaga-Dagbui, D. and Z, I. "Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation". Transportation Research Part A: Policy and Practice 92, pp. 184-194. http://www.sciencedirect.com/science/article/pii/S0965856415302871.

Lowe, P. (2020). Statement to the House of Representatives Standing Committee on Economics. Hearing on Reserve Bank of Australia annual report 2019. https://parlinfo.aph.gov.au/parllnfo/download/committees/commrep/868db039-2384-4ce9-a502-1354709677d2/toc_pdf/Standing%20Committee%20on%20Economics_2020_08_14_7974_Official.pdf;fileType=application%2Fpdf#search=%22committees/commrep/868db039-2384-4ce9-a502-1354709677d2/0000%22.

Lucas, C. and Carey, A. (2017). "North East Link options reveal new road could cost as much as $23 billion". The Age. https://www.theage.com.au/national/victoria/north-east-link-options-reveal-new-road-could-cost-as-much-as-20-billion-20170807-gxqp6s.html.

Lucas, C. and Jacks, T. (2017). "North East Link route confirmed as government sets budget at $16.5 billion". The Age. https://www.theage.com.au/national/victoria/route-chosen-for-new-melbourne-freeway-20171124-gzryck.html.

(2018). "Hundreds of millions more to plan rail loop, but not all on board". The Age.

https://www.theage.com.au/politics/victoria/hundreds-of-millions- more-to-plan-rail-loop-but-not-all-on-board-20181014-p509kz.html.

Ludlow, M. (2019). "Angry farmers vow to fight $1 Ob inland rail project". Australian Financial Review.

https://www.afr.com/politics/federal/angry-farmers-vow-to-fight-1Ob-inland-rail-project-20190426-p51hfh.

Marszalek, J. (2020). "Kate Jones promises to deliver $5.4 billion Cross River Rail project on budget". Courier Mail.

https://www.couriermail.com.au/news/queensland/kate-jones-promises-to-deliver-54-billion-cross-river-rail-project-on-budget/news-story/da8f1e7de8f7850f4cf620d348500b20.

McCutcheon, P. (2020). "Queensland Opposition lands blows in Parliament over Brisbane Cross River Rail cost blow-out". ABC News.

https://www.abc.net.au/news/2020-08-12/queensland-controversy-over-brisbane-cross-river-rail-plan/12545858.

McDonald, P. (2020). A projection of Australia's future fertility rates. Analysis by Peter McDonald for the Centre for Population.

https://population.gov.au/downloads/McDonaldFertilityProjections.pdf.

McGinn, C. (2019). "New trains, own line, for Melbourne loop". Canberra Times. https://www.canberratimes.com.au/story/6507921/new-trains-own-line-for-melbourne-loop/.

Merrow, E. (2011). Industrial Megaprojects: Concepts, Strategies, and Practices for Success. Wiley.

Metro Tunnel (n.d.). Frequently Asked Questions.

https://metrotunnel.vic.gov.au/about-the-project/faq.

Minnikin, S. (2020). Letter to Auditor-General, https://www.parliament.qld.gov.au/Documents/TableGffice/TabledPapers/2020/5620T1143.pdf#:~:text=However%2C%20information%20received%20from%20various,four%20years%20away%20from%20completion.

North East Link Project (2020). About. https://northeastlink.vic.gov.au/about/.

NSW Government (2010). Metropolitan Transport Plan: Connecting the City of Cities. NSW Government.

https://web.archive.org/web/20110406101341http://www.nsw.gov.au/metropolitantransportplan.

(2013). NSW Budget 2013-14: Infrastructure Statement. Budget

Paper 4. https://www.treasury.nsw.gov.au/sites/default/files/pdf/2013-2014_Budget_Papers_BP4_lnfrastructure_Statement.pdf.

(2016). $12 billion in budget for metro rail revolution.

https://www.nsw.gov.au/media-releases/12-billion-budget-for-metro- rail-revolution.

(2019). Sydney Metro to open in three weeks.

https://www.nsw.gov.au/media-releases/sydney-metro-to-open-three-weeks.

O'Sullivan, M. (2016). "WestConnex: Extra tunnel, road widening makes

$16.8b motorway even bigger". Sydney Morning Herald.

https://www.smh.com.au/national/nsw/westconnex-extra-tunnel-road-widening-makes-168b-motorway-even-bigger-20160719-gq8mae.html.

(2020a). '"I am sorry': Minister concedes metro line will blow out by $3 billion". Sydney Morning Herald.

https://www.smh.com.au/national/nsw/i-am-sorry-minister-concedes- metro-line-will-blow-out-by-3-billion-20200220-p542n0.html.

(2020b). "$4.3 billion cost blowout in Sydney's metro rail project".

Sydney Morning Herald.

https://www.smh.com.au/national/nsw/4-3-billion-cost-blowout-in-sydney-s-metro-rail-project-20200203-p53x7n.html.

Pallas, T. (2008). North East Link to Complete Orbital Freeway Network.

https://www.smh.com.au/cqstatic/gzsfpw/2008NELinkRelease.JPG.

Parkes-Hupton, H. (2019). "Sydney light rail class actions members swell past 200". Daily Telegraph.

https://www.dailytelegraph.com.au/newslocal/central-sydney/sydney- light-rail-class-actions-members-swell-past-200/news-Story/dfbc6b922ffce0b39fa2c282e47b0ba8.

Parliament of NSW General Purpose Standing Committee Number 4 (2010).

Transcript of hearing on transport, Central Coast. http://www.aptnsw.org.au/documents/estimates.html.

Parliament of Victoria (2020). North East Link Bill 2020.

https://www.parliament.vic.gov.au/publications/research-papers/send/36-research-papers/13949-north-east-link-bill-2020.

PC (2006). Potential benefits of the National Reform Agenda. Report to the Council of Australian Governments. Productivity Commission. https://www.pc.gov.au/research/completed/national-reform-agenda/nationalreformagenda.pdf.

(2014). Public infrastructure. Productivity Commission.

http://www.pc.gov.au/inquiries/completed/infrastructure/report.

Potter, B. (2020). "Small ticket projects can get budget billions flowing". Australian Financial Review.

https://www.afr.com/policy/economy/small-ticket-projects-can-get-budget-billions-flowing-20201006-p562fr.

Queensland Government (2017). Queensland Budget 2017-18: Capital Statement. Budget Paper 3.

https://s3.treasury.qld.gov.au/files/bp3-2017-18.pdf.

(2019). Queensland Budget 2017-18: Capital Statement. Budget Paper 3. https://budget.qld.gov.au/files/BP3.pdf.

Queensland Government and Brisbane City Council (2005). Airport Link Detailed Feasibility Study: Initial advice statement. http://eisdocs.dsdip.qld.gov.au/Airport%20Link/IAS/IAS%200ct%202005.pdf.

Rabe, T. and O'Sullivan, M. (2020). "Caution urged in states costing big transport projects after blowouts". Sydney Morning Herald. https://www.smh.com.au/national/nsw/caution-urged-in-states-costing-big-transport-projects-after-blowouts-20200220-p542ty.html.

Ramey, V. A. (2019). "Ten years after the Financial Crisis: what have we learned from the renaissance in fiscal research?" Journal of Economic Perspectives 33.2, pp. 89-114.

Rooney, K. (2020a). "Transurban announces West Gate Tunnel now expected to be finished by 2023". Herald Sun.

https://www.heraldsun.com.au/news/victoria/transurban-announces-west-gate-tunnel-now-expected-to-be-finished-by-2023/news-Story/59f7c8cd6276ede2f68f702ef0183f98.

(2020b). "West Gate Tunnel lay-offs begin as builders blame financial strain". Herald Sun.

https://www.heraldsun.com.au/news/victoria/west-gate-tunnel-layoffs-begin-as-builders-blame-financial-strain/news-Story/0d73c99c08c1d4cba17bcd7aa404b8ec.

Rostron, S. (2016a). "CPB Contractors win $384m Section C of Bruce Highway Upgrade". Felix Project News.

https://www.felix.net/project-news/cpb-contractors-win-384m-section-c-of-bruce-highway-upgrade-cooroy-to-curra.

(2016b). "CPB Contractors awarded $420m Gold Coast Light Rail Stage Two". Felix Project News, https://www.felix.net/project-news/cpb-contractors-awarded-420m-gold-coast-light-rail-stage-two.

Sanda, D. (2017). "Electricity sell off benefits NSW projects". Yahoo News. https://au.news.yahoo.com/electricity-sell-off-benefits-nsw-projects-35475392.html?guccounter=1.

Saulwick, J. (2012). "Sydney transport shake-up: plan for single deck metro-style trains and second harbour crossing". Sydney Morning Herald. https://www.smh.com.au/national/nsw/sydney-transport-shake-up-plan-for-single-deck-metro-style-trains-and-second-harbour-crossing-20120620-20ngm.html.

(2015). "Multimillion-dollar compensation brawl brews over WestConnex St Peters interchange". Sydney Morning Herald. https://www.smh.com.au/national/nsw/multimilliondollar-compensation-brawl-brews-over-westconnex-st-peters-interchange-20150903-gje9oi.html.

Seimiatycki, M. (2009). "Academics and auditors: Comparing perspectives on transport project cost overruns". Journal of Planning Education and Research 29, pp. 142-156. DOI: 10.1177/0739456X09348798.

https://www.researchgate.net/publication/238430262_Academics_and_Auditors_Comparing_Perspectives_on_Transportation_Project_Cost_Overruns.

SGS Economics & Planning (2015). Strategic Review of the WestConnex Proposal: Final Report.

https://www.cityofsydney.nsw.gov.au/-/media/corporate/files/2020-0?-migrated/files_1/140511-final-report-150409.pdf?download=true.

(2019). North East Link Project - Net community benefit review.

https://s3.ap-southeast-2.amazonaws.com/hdp.au.prod.app.vic-engage.files/5815/6325/4909/28k._BBW_City_Council_-_Terry_Rawnsley_-_Expert_Witness_Report_-_Net_Community_Benefit_-_15_07_2019.pdf.

Smith, T. (2020). "Supplying a fiscal lifeline: Valerie Ramey discusses what economists have learned about stimulus since the 2008 financial crisis". American Economic Association.

https://www.aeaweb.org/research/valerie-ramey-fiscal-policy-after-financial-crisis.

Supreme Court of New South Wales (2020). Light Rail Nuisance Class Action. http://www.supremecourt.justice.nsw.gov.au/Pages/sco2_classaction/Light-Rail-Nuisance-Class-Action.aspx.

Terrill, M. and Danks, L. (2016). Cost overruns in transport infrastructure.

Report No. 2016-13. Grattan Institute. https://grattan.edu.au/report/cost-overruns-in-transport-infrastructure/

Terrill et al (2018). Terrill, M., Batrouney, H., Ha, J. and Hourani, D.

Remarkably adaptive: Australian cities in a time of growth. Grattan Institute. https://grattan.edu.au/wp-content/uploads/2018/10/909-Remarkably-adaptive-Australian-cities-in-a-time-of-growth.pdf.

Terrill et al (2019). Terrill, M., Moran, G. and Ha, J. Why it's time for congestion charging: better ways to manage busy urban roads. Report No. 2019-10. Grattan Institute.

https://grattan.edu.au/report/why-its-time-for-congestion-charging/.

Terzon, E. (2020). "EPA approves controversial West Gate Tunnel Project soil-dumping plan for Bacchus Marsh". ABC News.

https://www.abc.net.au/news/2020-09-01/epa-approves-pfas-soil-dumping-plan-bacchus-marsh/12618482.

Transport and Infrastructure Council (2015). Infrastructure benchmarking report, https://www.transportinfrastructurecouncil.gov.au/sites/default/files/lnfrastructure_Benchmarking_Report.pdf.

(2020). Communique of 13th meeting of the Transport and Infrastructure Council of the Council of Australian Governments. https://www.transportinfrastructurecouncil.gov.au/sites/default/files/documents/13th-transport-and-infrastructure-council-communique.pdf.

Transport Canberra (2019). City to Gungahlin Light Rail Project Delivery Report. Transport Canberra.

https://www.transport.act.gov.au/about-us/public-transport-options/light-rail/light-rail-network/light-rail-project-delivery-report.

Transport for NSW (2012). Fixing the trains: Sydney's rail future.

https://www.transport.nsw.gov.au/newsroom-and-events/media-releases/fixing-trains-sydneys-rail-future.

(2020). Sydney Pinch Point Programs: Overview.

https://www.rms.nsw.gov.au/projects/01documents/easing-sydneys-congestion/pinch-point-fact-sheet-2020-05.pdf.

Transurban (n.d.). M4-M5 Link Tunnels.

https://www.westconnex.com.au/roads-projects/m4-m5-link-tunnels/.

Treasurer of Victoria and Transurban (2017). West Gate Tunnel Project Agreement, https://www.dtf.vic.gov.au/sites/default/files/2018-01/West-Gate-Tunnel-Project-Agreement.pdf.

Trembath, M. (2012). "Greenlight for WestConnex tollway". St.George and Sutherland Shire Leader. 3 October.

Ulubasoglu, M. and Onder, Y. K. (2020). "Teleworkability in Australia: 41 per cent of full-time and 35 per cent of part-time jobs can be done from home". The Conversation.

https://theconversation.com/teleworkability-in-australia-41-of-full-time-and-35-of-part-time-jobs-can-be-done-from-home-140723.

VAGO (2018). Assessing Benefits from the Regional Rail Link Project. Victorian Auditor General's Office.

https://www.audit.vic.gov.au/sites/default/files/2018-05/20180510-Regional-Rail-Link.pdf.

(2019a). Market-led Proposals. Victorian Auditor General's Office. https://www.audit.vic.gov.au/report/market-led-proposals.

(2019b). Melbourne Metro Tunnel Project - Phase 1: Early Works. Victorian Auditor General's Office.

https://www.audit.vic.gov.au/sites/default/files/2019-06/060619-Metro-Tunnel_1.pdf.

Victorian Department of Economic Development, Jobs, Transport and Resources (2016). Melbourne Metro Business Case.

https://metrotunnel.vic.gov.au/data/assets/pdf_file/0006/40677/MM-Business-Case-Feb-2016-WEB.pdf.

Victorian Department of Treasury and Finance (2019). Metro Tunnel Project. https://www.dtf.vic.gov.au/partnerships-victoria-ppp-projects/metro-tunnel-project.

Victorian Government (2008). The Victorian Transport Plan. https://web.archive.org/web/20120325004350/ https://transport.vic.gov.au/_data/assets/pdf_file/0013/31342/vtp.pdf.

(2015). Western Distributor Business Case.

https://transport.vic.gov.au/-/media/tfv-documents/western-distributor/western-distributor-business-case-redacted.pdf.

(2017). West Gate Tunnel Project Summary.

https://www.dtf.vic.gov.au/sites/default/files/2018-01/West-Gate-Tunnel-Project-Summary.pdf.

Victorian Government (2018a). North East Link Business Case. https://northeastlink.vic.gov.au/planning/businesscase.

(2018b). Suburban Rail Loop Strategic Assessment. https://bigbuild.vic.gov.au/_data/assets/pdf_file/0006/325572/Suburban-Rail-Loop-Strategic-Assessment.pdf.

(2019). Victorian Budget 2019-20: Budget Paper 4. https://www.budget.vic.gov.au/budget-papers.

WA Government (2001). WA Budget 2001-02: Budget Statements. Budget Paper 2. https://www.ourstatebudget.wa.gov.au/2001-02/budget-papers/bp2/paper2.pdf.

(2002). WA Budget 2002-03: Budget Statements. Budget Paper 2. https://www.ourstatebudget.wa.gov.au/2002-03/budget-papers/bp2/bp2.pdf.

West, A. (2010). "All roads lead to the city: North-west rail delay, Metros dumped, Light rail for inner west". Sydney Morning Herald. 22 February.

WestConnex (2013). WestConnex Business Case Executive Summary. https://www.westconnex.com.au/media/ixebloea/westconnex-business-case-executive-summary-september-2013.pdf.

(2015). WestConnex Updated Strategic Business Case. http://infrastructurepipeline.org/wp-content/uploads/2016/10/WestConnex-Updated-Strategic-Business-Case-November-2015-1.pdf.

Wiggins, J. (2017). "Inland rail costs could blow out to $16b, says National Trunk Rail". Australian Financial Review.

https://www.afr.com/companies/inland-rail-costs-could-blow-out-to-16b-says-national-trunk-rail-20170511-gw2k2i#:~:text=The%20federal%20government%20this%20week,seven%20years%20from%202017%2D18..

(2020a). "West Gate Tunnel dispute veers towards 'full-flung fight'". Australian Financial Review.

https://www.afr.com/companies/infrastructure/west-gate-tunnel-dispute-veers-towards-full-flung-fight-20200617-p553g3.

(2020b). "Construction 'on brink of collapse', says John Holland CEO". Australian Financial Review.

https://www.afr.com/companies/infrastructure/construction-on-brink-of-collapse-says-john-holland-ceo-20200317-p54b2b.

Willingham, R. (2019). "Metro Tunnel machines grind to halt in dispute over billions in cost blowouts". ABC News.

https://www.abc.net.au/news/2019-12-09/melbourne-metro-tunnel-project-grinds-to-halt-amid-dispute/11779986.

Wright, S. and Crowe, D. (2020). "A 'short-term window' to build infrastructure for long-term gain". The Age.

https://www.theage.com.au/politics/federal/a-short-term-window-to-build-infrastructure-for-long-term-gain-20200906-p55sc5.html.