7.21.3 Measurement and Verification Plan

An effective Measurement and Verification Plan that complies with the requirements of the IPMVP would include the following non-exhaustive list of components:

Facility and project overview

Energy saving project intent

Selected IPMVP Option and measurement boundary

Baseline: period, usage and conditions

Reporting period

Basis for adjustment

Calculation methodology and analysis procedure

Energy prices

Meter specifications

Monitoring responsibilities

Expected accuracy

Budget

Report format

Quality assurance

In summary, the table below outlines the steps involved in developing a project which is adherent with IPMVP.

Figure 10

Summary Measurement and Verification Plan

Further information can be obtained by downloading the IPMVP Core Concepts from IPMVP - Efficiency Valuation Organization (EVO) (evo-world.org)